MUE 現代超音波有限公司 Modern Ultrasonic Engineering Co., Ltd.

http://www.mue.com.tw

Products  About us  Contact us  News  Technology

Ultrasonic Testing

   

 

MUE18T Ultrasonic

Pressure Meter

 

MUE19 Ultrasonic

Pressure Monitor

 

MUE180GI Ultrasonic

Pressure Test Rods

 

MUE180GL Ultrasonic

Pressure Test Rods

 

MUE180TI&TL Ultrasonic

Pressure Test Rods

 

MUE180SI Ultrasonic

Pressure Test Rods

   

Ultrasonic PROCESSING

   

 

MUE102

Ultrasonic Generator

 

MUE32H High-frequency

Ultrasonic  Generator

 

Ultrasonic Vibration 

Plate  &  Tank

 

MUE13C Tabletop  

Ultrasonic Cleaner

 

MUE33C  Focused

Ultrasonic Processor

 

MUE68 Multi-Purpose 

DC Power Supply

   

MUE13C Tabletop Ultrasonic Cleaner

Overview

Front panel

Front panel

* Frequency Fine Tune knob

* Heater Switch

* Vibration Switch

* Power Switch

* Green Power Indicator

* Orange Heater Indicator

Right Side

* Valves

Rear panel

* Power socket

 

instructions

[a]

Check the water level is correct. 

[b]

Connect the power cord to the AC outlet. Check the supply voltage is correct. Turn on the power. The green power indicator is on

[c]

Check the output power level is OK. If need, adjust the frequency fine tune knob to eliminate the temperature effect to maintain the best working condition.

[d]

The electric energy output by ultrasonic generator to drives the oscillators produce ultrasonic energy, which is then transferred to the water inside the vibration tank to play a cleaning function. If the ultrasonic energy cannot be transmitted to the water, it will cause damage to the oscillators. Therefore, the following situations must be avoided.

[1]Power on while no water in the vibration tank.

[2]Vigorously stir the water in the vibration tank. If find that there is no vibration wave in the water because of this, please turn off the power and wait for 3~5 minutes before turning the power back on.

[3]The water contains too much chlorine or other gases. It also hinders the transmission of ultrasonic energy. It is necessary to wait 15~30 minutes for the gas content to drop before turn on the power.

[e]

If heater be used, turn off the vibration switch first, then, switch on the heater, the orange heater indicator is on. While the water temperature is as request, switch on the ultrasonic vibration for cleaning processing. 

[f]

After use, turn off the power.

 

Last Update2022-06-18

 

Language

 

 

中文 Chinese

 

 

英文 English  

 

Contact us

Tel:886-2-2626-3081

Fax:886-2-2626-3021

E-mail:tl@mue.com.tw

Technology

 

 

FAQs

 

 

Back to MUE13C

Copyright © Modern Ultrasonic Engineering Co., Ltd. 現代超音波有限公司